| 2004 |
Hydrogeological impact of new town development, Googong,
NSW - Assessment of hydrogeological conditions and potential
impact of Act water supply from Googong Dam |
| |
Hydrogeological Study - Portland Landfill
|
| 2003 |
Parramatta-Chatswood Rail Link, NSW. Review of Groundwater Management
Plan - for Thiess Hochtieff Joint Venture |
|
Western
Sydney Orbital Road. Review of groundwater conditions - for
SMEC / Maunsell Joint Venture.
Sydney Cross-City Tunnel. Independent Verification, groundwater
issues and groundwater modelling - for Hyder Consulting (Australia)
Pty Ltd |
|
Energy
Australia Tunnel, Sydney. Impact of groundwater inflows on
durability of concrete and steel - in a tunnel through sandstone
and the Great Sydney Dyke - for Pells Sullivan Meynink Pty
Ltd
|
|
Eastern
Freeway, Victoria. Review of groundwater issues and technical
review of tenders for a large motorway tunnel - for Vic Roads
|
| 2002 |
Parramatta-Chatswood Rail Link, NSW. Re-assessment of hydrochemical
conditions and predicted salinity and iron/manganese content
of groundwater inflow to proposed tunnel. Assessment of discharge
and disposal options - for Ove Arup / Transfield
|
|
Parramatta-Chatswood
Rail Link, NSW. Peer review of assessment (SMEC) of hydrogeological
conditions and predictions of groundwater inflow to tunnel,
including review of numerical groundwater flow modelling -
for SMEC / Baulderstone-Hornibrook
|
| 2001 |
Bulk relining of sewers in the Hawkesbury-Nepean Area. Assessment
of environmental impacts and preparation of REFs - for Thiess
Services / Sydney Water |
| |
Blue
Mountains Sewage Tunnel, NSW. Investigation of cause, assessment
of environmental impact and recommendations for remedial action
following large inflows of groundwater to bored sewer connections
in Leura - for Sydney Water |
| |
Coalbed
Methane Recovery, Sydney Basin. Assessment of Groundwater Impacts
at Cawdor (Camden) - for Sydney Gas Operations P/L |
| |
Daroobalgie
- Forbes Groundwater Investigations. Groundwater impacts of
rural infrastructure development - for Terra Consulting Pty
Ltd |
| 2000 |
Proposed Parkes Hub, NSW. Assessment of groundwater impacts
of proposed railfreight interchange |
| 1998 |
Proposed Freight Interchange, Dubbo, NSW. Assessment of groundwater
impacts |
| 1997 |
Groundwater Resources Study, Dubbo, NSW. Assessment of groundwater
resources available for prospective industrial subdivision -
for Terra Sciences Pty Ltd and Dubbo City Council |
| |
Groundwater
Vulnerability Study, Dubbo, NSW. Potential groundwater impacts
of proposed industrial subdivision (Candidate Area 3) - for
Terra Sciences Pty Ltd and Dubbo City Council |
| |
M5
East Motorway, Sydney, NSW. Review of potential groundwater
impacts and subsidence risk - for the Roads and Traffic Authority |
| 1995 |
Keswick Environmental Assessment and Structure Plan, Dubbo.
Assessment of impacts of proposed rezoning and urban development
on groundwater resources, including assessment of aquifer vulnerability
to surface-derived pollution, and impact on groundwater recharge |
| |
M5
East Environmental Impact Statement. Preparation of a supplementary
report providing an assessment of hydrogeological conditions
and hazards relating to soil erosion, acid sulphate soils and
the potential for groundwater contamination - for Connell Wagner
and the Roads and Traffic Authority |
| 1990-94 |
Rural Residential Subdivision, Oberon, NSW. Assessment of groundwater
availability and impacts of on-site waste disposal, review of
wastewater treatment options - for a confidential client |
| |
Horizons
Resort, Salamander Bay, NSW. Assessment of the impact of residential
and resort development on groundwater and wetlands - for Gutteridge
Haskins and Davey Pty Ltd |
| |
Environmental
Study, Wallagoot Lagoon, Bega, NSW. Study of the impact of subdivision
of agricultural land on a coastal lagoon - for Bega Valley Shire
Council |
| |
Wastewater
Disposal, Hartley Valley, NSW. Investigation of ground conditions
for on-site disposal of wastewater on 47 blocks of a proposed
subdivision. Specification of wastewater treatment system to
meet stringent discharge requirements - for John Bowden and
Co |
| |
Wastewater
Disposal, Springwood, NSW. Appraisal of site conditions for
disposal of treated effluent from a macrophyte wastewater treatment
system at Waratah retirement village, including representation
at a successful appeal in the Land and Environment Court - for
Frank Hudson. |
| |
  |